Metal roofs
Standing-seam metal for houses and screw-down panels for shops, barns and porches, down to a 3 in 12 slope.
What's included
- Panels cut to length for your roof
- Standing seam with hidden fasteners, or screw-down panels with sealed screws
- Underlayment and closures at the eaves and ridge
- Trim, ridge cap and flashing in a matching color
- Snow guards over doors and walkways if you want them
- Typical shop or barn
- 2 to 4 days
- Lowest slope
- 3:12
- Workmanship warranty
- 10 years
- Quote
- Free, in writing
Materials
- Standing-seam panels
- Steel panels with raised seams that lock over hidden clips, so no screws go through the roof. Our choice for houses.
- Screw-down panels
- Ribbed steel panels fastened with screws that have rubber washers. Common on shops, barns and porches.
- Underlayment
- A synthetic underlayment made for the heat under a metal roof, on every house.
- Foam closures
- Shaped foam strips at the eaves and the ridge that keep out wasps, birds and blowing rain.
- Trim and ridge cap
- Edge trim, ridge cap and wall flashing, in the same color as the panels.
Step by step
- 01
Measure and order
We measure each face of the roof so panels arrive cut to length. They usually take 1 to 2 weeks to come in.
- 02
Get the roof ready
On a house, the old shingles come off. On some barns, new wood strips go over the old roof instead.
- 03
Underlayment and eave trim
Underlayment goes on, then the eave trim the panels sit on.
- 04
Panels
Panels go on from 1 end, checked for square every few panels so the seams run straight.
- 05
Ridge, trim and closures
Closures, ridge cap and trim finish the edges and the top.
- 06
Cleanup and walk-through
We pick up metal scraps and screws with a magnet and walk the roof line with you.
Not included
- Insulation or spray foam under the panels in shops and barns.
- Gutters.
- Raising a low roof to a steeper slope, or other framing changes.
- Taking off and putting back solar panels. Your solar company does that.
More answers on the questions page.
Other services
Shingle roofs
Tear-off and a new shingle roof, usually in 1 to 3 days.
Repairs and leaks
Leaks, missing shingles and flashing. We tarp first, then fix.
Storm damage
Hail and wind damage. We tarp, photograph it and meet your adjuster.
Roof inspections
A written report with photos, for a check-up, a sale or after a storm.